Cavity wall construction is well underway, featuring robust thermal insulation sandwiched between the dense internal blockwork and the precise external red brick detailing. Cavity trays and damp-proof courses are visibly integrated above the openings to guarantee long-term weatherproofing and structural integrity.
Precast concrete lintels have been precisely bedded across the window and door openings to evenly distribute the structural loads from the upper masonry courses.
The structural steelwork phase has officially commenced, with the first major steel beams hoisted into position and bedded onto concrete padstones. These universal beams span the large open-plan zones, engineered to support the upcoming floor and roof structures while keeping the internal spaces expansive and fluid.
With the shell reaching joist height and the clear blue sky framing the progress, the site is perfectly primed for the upcoming roof construction. The build is moving forward with excellent momentum, and the sheer scale of this premium residence is now fully on display.